BELZONA TECHNOSOL PROVIDES LEVEL SURFACE ON A WALKING FLOOR
https://khia.belzona.com/view.aspx?id=7919Application took place on a section of flooring within the ‘Walking Floor Area’ which has become damaged over the years. The Walking Floor Area is used to store and process wood chippings before dropping down onto a conveyor system. The wood chippings are brought to...
Water ingress and weathering had caused corrosion of the reinforcement bar, leading to cracking and spalling of the concrete supports. Damaged and loose concrete was removed before the surface was abraded using mechanical tools to clean and roughen the surface, and...
The surface of the concrete ramp had become damaged due to impact from the gas cylinders when being loaded and unloaded, even though they are dropped onto a rubber mat. The uneven surface was making it increasingly difficult for the tall narrow cylinders to stand up...
The jet tubes suffer cavitation due to the high flow rates through them. Application is carried out in accordance with Belzona Know-How System Leaflets SOS-1 & 2. After removing and replacing "top hat" inspection covers, Belzona 1111 applied to fair off before...
Corrosion was occuring at the top edge of rubber riser sleeve due to water ingress between rubber cladding and riser. Application was completed in accordance with Belzona Know-How System Leaflet SOS-21. After completing the surface preparation, Belzona 1321 was...
Belzona Protects Platform Leg Above And Below Waterline
https://khia.belzona.com/en/view.aspx?id=3761Due to constant immersion in seawater the platform leg in the splash zone was suffering from corrosion and needed protecting. Application was carried out in accordance with a modified version of Belzona Know-How System Leaflet SOS-21. After manually preparing the...
Severe corrosion had caused pitting with some penetrations through the roof reducing the integrity of the refuge. refuge had to withstand a blast load of 0.25 bar. As this is an active gas storage unit welding was not an option for repairs. Application was carried out...
Lid gasket failure resulted in extensive oil leaks around flange on this 66-11Kv transformer. Most of the gasket had failed around the 10m perimeter of the lid, with oil seeping down the sides and going to ground. Unfortunately it was not possible to drain the oil...
Application was carried out in accordance with Belzona System Leaflets TCC-3 and TCC-5. after rebuilding deep pits with Belzona paste grade rebuilding product, Belzona 1391S was applied using heated airless spray with Belzona 1391T applied by brush as a stripe coat....
Application was carried out in accordance with Belzona Know-How System Leaflet VPF-17 using the Belzona flange face forming kit. Client was unable to use hot work and had restricted time. Application was carried out over a weekend and the entire solution, from first...